Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Excellentpix Excellentpix

Intelligence Redefined

Excellentpix Excellentpix

Intelligence Redefined

  • Green Energy
  • Tech News
  • Gadget
  • Smartphone
  • Laptop
  • PC
  • About Us
    • Advertise Here
    • Contact Us
    • Privacy Policy
    • Sitemap
  • Green Energy
  • Tech News
  • Gadget
  • Smartphone
  • Laptop
  • PC
  • About Us
    • Advertise Here
    • Contact Us
    • Privacy Policy
    • Sitemap
Subscribe
Close

Search

Laptop

GMG schools eyeing early March for full return to classrooms | News, Sports, Jobs

By Maria H. Gray
February 15, 2022 4 Min Read
Comments Off on GMG schools eyeing early March for full return to classrooms | News, Sports, Jobs

Contributed photos — The corner of a classroom at the GMG Secondary building in Garwin sits with standing water meeting the bottom of a bookshelf. The water damage came as a result of a water pipe breakage that occurred on the evening of Jan. 7.

GARWIN — A month after a water pipe break caused major damage at the GMG Secondary school in Garwin, steady progress has been made toward returning students to 100 percent in-person learning by Mar. 6.

On Jan. 7, Secondary Principal Jaimie Gargas and teacher Tiya Montano discovered a cascade of water coming down the hallway when they returned to the school from a debate competition that evening.

A pipe on the third story of the school’s north wing, which was built in 1920, ruptured, sending water down into the second floor. It eventually leaked into the first floor.

A report issued as part of a letter to GMG families indicated that a total of eight classrooms and five office spaces sustained heavy water damage, and approximately 70 percent of the instructional spaces at GMG Secondary were affected in all.

Since the second week of January, students have been attending classes under a hybrid learning plan that rotates their schedule in the building to every other day.

Extracurricular activities have been able to continue in the areas of the school not affected by the water damage, and enough classroom space has remained available to allow at least 50 percent of classes to take place each day.

The plan received emergency approval through the Iowa Department of Education and has been renewed on a weekly basis as needed.

Similar to the distance-learning protocols adopted for the COVID-19 pandemic, students were issued laptops to use for schoolwork at home as well as mobile internet hotspots for those without access to internet at home.

In the letter to parents, Gargas encouraged families to reach out for accommodations if students were in need of assistance or extra help on days that they were not scheduled to be in the building.

“We’ve been quite fortunate to have half of the building available for use — it honestly could’ve been much worse,” Gargas said in the letter. “Our sense of community has made this experience much easier to deal with, as has the ‘practice’ we had with COVID-19.”

School meal services have also been made available to all students regardless of whether they are scheduled to attend class in the building that day or not.

Assessment of the water damage from restoration and insurance professionals working with the district showed a number of needs in the damaged wing — including replacing flooring, cleaning carpeting, repairing and replacing drywall, replacing ceilings, mitigation for moisture and mold, replacing baseboard, painting in several rooms as well as testing and abatement of asbestos where necessary.

The walkthrough report indicated asbestos abatement may not be covered by insurance, but it’s unclear if any asbestos had been uncovered.

The restoration work has progressed relatively on schedule, and Gargas said that although the return date of Mar. 6 is subject to change, things continue to move in the right direction.

Contributed photos — The corner of a classroom at the GMG Secondary building in Garwin sits with standing water meeting the bottom of a bookshelf. The water damage came as a result of a water pipe breakage that occurred on the evening of Jan. 7.



Today’s breaking news and more in your inbox













































Source News

Tags:

classroomsEarlyEyeingfullGMGJobsmarchnewsreturnSchoolsSports
Author

Maria H. Gray

Follow Me
Other Articles
Previous

Factories Just Ruined 16 Billion Gigabytes of Flash Storage

Next

Ditch DirectX: It’s time to start using Vulkan with PC games

September 2026
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
282930  
« Aug    

Archives

Categories

  • Car
  • Entertainment
  • Gadget
  • Games
  • general
  • Green Energy
  • internet marketing
  • Laptop
  • Lifestyle
  • PC
  • Property
  • Real estate
  • SEO
  • Smartphone
  • Start Up
  • Tech News
  • Technology

Recent Posts

  • Rev Your Engines: Unleashing the Future of Smart and Sustainable Cars
  • The Untold Growth Hacks of Unicorn Startups: How Tiny Companies Become Billion-Dollar Giants
  • The Future Unveiled: Latest Tech Breakthroughs You Can’t Miss
  • Top Laptops of 2024: Unleashing Power, Portability, and Performance
  • Boost Your PC’s Power: Creative Ways to Upgrade Your Computer Without Breaking the Bank

fiver

Fiverr Logo

Tags

Amazon Android announces app Apple Big Black Buy Car coming deals Electric Galaxy game games gaming Google Heres Hunter iPhone laptop Laptops launch Market Microsoft news phone Pro Release Review sale Sales Samsung Series Smartphone software startup startups Stock tech Tesla top Windows Xbox year

PHP 2026

prizebudgetforboys
howardlalanne

BL

excellentpix.com

WhatsApp us